ACPL takes on the toughest challenges in engineering. Procurement, constructions, maintenance, and project management.
Here is the list of some of the projects we have completed & ongoing.
  Modernisation work of Bhadra Right Bank Main Canal for KNNL Completed in a record time of 39 days, compared to stipulated 60 days.
  Industrial layout Formation for KIADB at Tumkur District.
  Lift Irrigation scheme for KNNL at Tunga River, Shimoga on Turnkey Basis.
  Lift Irrigation scheme for KNNL at Yettinahole package-I, Sakaleshpura, Hassan on Turnkey Basis.It also includes drinking water supply to chikkaballapur & Kolar District.
  Constructions of BESCOM integrated control centre-1 based on parameters fixed by BESCOM on EPC at HSR Layout, Bangalore. One of it’s kind & first BESCOM Distribution & Automation system Building in India
  Improvements to Old Maddur, Shimoga & Kowdle branch canals for CNNL at Mandya District.
  Construction of Malghan West Canal including Major Structures for KBJNL at Yadgir.
  Lift irrigation scheme to fill up MI 10 tanks under KBJNL at Bijapur and Bagalkot has been completed in record time of 6 months as against the original time of 18 months in the year of 2017.
  Lift irrigation scheme to fill up Devalapur tanks under water resource department (MI) at Gangawati, Koppal Dist on turnkey basis has been completed in well advanced time.
  Lift irrigation scheme for KBJNL at Muddebihal Taluk, Bijapur Dist, on the name of work Budihal Peerapur LIS. It includes one of the major head (246M ) & 2350MM of outer Dia. mild steel pipe.
  UDUGANI-TALAGUNDA-HOSURU TANK FILLING SCHEME-Lifting of water from Tungabhadra river near Puradakere village to feed Tanks of Existing MI/ZP Tanks in Udugani Talagunda Hosuru Hobli of Shikaripura Taluk of Shivamogga District.

All rights reserved Amrutha Constructions Pvt. Ltd © | Privacy policy

facebook image google image google image twitter image instagram image